Technical Data | |
Project launch | 2016 |
L.o.a. [m] | 14.00 |
Beam [m] | 4.30 |
Draft [m] | 1.20 |
Displacement [t] | 14.00 |
Fuel [l] | 2 x 780 |
Hull | GRP |
Quick links |
||||||
|
The Storebro 460 Commander project was presented in November 2013 and was the first after the bankruptcy in late 2012, with the first Commander 460 scheduled to be launched in 2015.
After a long time of not having heard or read about the project, a revised picture of the ship was surprisingly presented on the company's Facebook page on 2020-06-27. At the same time, reference was made to the 2021 product line. However, these images were only design references for new models.